Latest Headlines


Cedar Point Gatekeeper Project

Posted on Tuesday, October 30th, 2012

A.A. Boos crews begin the placing of a highly complicated series of foundations for the newest roller coaster at Cedar Point. The Gatekeeper will be the tallest, steepest, longest, and fastest roller coaster of its kind.

aaboos-cedar-point


Flying J Truck Stop

Posted on Tuesday, October 30th, 2012

A.A. Boos crews build a new LPG fueling station in Stony Ridge, Ohio.

aaboos-flying-j



Glass City Federal Credit Union

Posted on Tuesday, October 30th, 2012

A.A. Boos completes the envelope of a building to house the bank in Bowling Green, Ohio.

aaboos-glass-city


Great Lakes Museum

Posted on Tuesday, October 30th, 2012

A.A. Boos crews place a large concrete structure for the dock area of the Great Lakes Museum on the Toledo Riverfront.

aaboos-great-lakes


Dunn Chevy

Posted on Tuesday, October 30th, 2012

A.A. Boos builds a new addition and renovation of the current building at Oregon’s Chevy Dealer.

aaboos-dunn-chevy


First Energy Maintenance Building

Posted on Tuesday, October 30th, 2012

A.A. Boos crews build a new maintenance building for the Lakewood Service Center.

aaboos-first-energy


Water Intake Project

Posted on Tuesday, October 30th, 2012

A.A. Boos employees located at the BP/Husky Refinery finish a new building to house the controls for the intake of water directly from Lake Erie into the plant to be used for process water.

aaboos-water-intake


Toledo Waterways Initiative

Posted on Monday, April 16th, 2012

A.A. Boos builds a large containment and diversion system to divert unwanted water from overloading the current system:

aaboos-waterways


Oregon City Schools Renewable Energy Project

Posted on Tuesday, December 27th, 2011

A.A. Boos was recognized at a ceremony recently, kicking off a project designed to allow the school system to operate fully using green energy.  Research was performed by the school’s students under the direction of the science department.  A.A.  Boos built the foundations for two wind turbines scheduled to begin producing energy early next year.

 oregonschools


University of Toledo

Posted on Tuesday, November 15th, 2011

Crews return to UT to renovate two campus buildings to house the biology department.  The new addition will be called the “Biosphere”.

aaboos10